I have been using the MP3435 evaluation board. I have been overloading it repeatably. I have noticed that the point that it overloads has been getting lower. Any idea of why this is?
From your previous post it seems that you chose to parallel 2 evbs. This part does not seem to specify that capability. You could have caused some damage, but I am not sure.
You say the overload point keeps going lower. What is it at now what was it at before? Is this when the boards are paralleled or when they are standalone?